Division Curtain Installation – East Lothian
The Brief
Port Seton Centre were Looking for a divider to create a fourth wall in a sports hall which was recently completed to create two distinct spaces. The centre didn’t have a track for the division curtain, meaning a bespoke solution would be needed for them.
Installation
Our engineers dove headfirst into this, designing and coming up with a bespoke solution for the sports centre. The perforated sheet is a structural element, but attaching items to it would require extended brackets or spreader plates. The radiant panel has been fixed in this manner and with some care, the curtain track could share the same timber plates which are mounted to the rear of the panel face.
Outcome
Port Seton Centre were very happy with the finished article – a bit of a different one as we had no room for bracketry. We had to install the division curtain using cables rather than a trackway, which was a bespoke solution that we had devised for them.
Location
Port Seton Centre
Date
20/01/2022
Job Type
Installation of Division Curtain