The Brief
Holbrook CofE Primary School approached Sportsafe looking to replace their existing wetpour. The team attended the site before any works were completed to talk through the options and ensure all details were correct before arranging for the installers to attend. An Artificial Grass overlay was selected as the most suitable option for Holbrook Primary.
Installation
The 6m x 6m area was prepped by securing down any areas of the existing wetpour that experienced lifting. The Artificial Grass was laid out and cut around the existing play equipment. A machine brush was used to spread silica sand into the pile to draw heat away in the warmer weather.
Outcome
The Artificial Grass overlay provided a cost effective option which provides the area with a new look and fresh life expectancy.
Location
Holbrook CofE Primary School
Job Type
Wetpour Overlay with Artificial Grass