Wetpour Rubber Crumb Surface – Moulton School
The Brief
Location:
Moulton School
Date:
Jan 03 – 2023
Job Type:
Installation of Wetpour Rubber Crumb Surface
Get In Touch TodayThe outer perimeter of the crumb surface was in need of replacement due to lifting from the concrete surface. The affected area measured 12.4 meters in length and 7.5 meters in width. To address the issue, the existing crumb at the edge had to be cut away and the area re-leveled to be flush with the existing blue crumb and concrete surface on the outside..
Installation
First, our engineers ensured that the replacement area was clear of any obstacles. They then cut away the lifting crumb along the outer perimeter of the affected area. The affected area was pre-cleaned by the site manager, and then leveled to the exposed concrete surface to ensure a smooth and even base for the new crumb. The crumb area was then relevelled to be flush with the existing blue crumb and concrete surface on the outside. This helps to ensure a smooth and even surface for continued use. The new Wetpour Rubber Crumb was then poured into the prepared surface, taking care to evenly spread the material and compact it into place.
View Outdoor SurfacesTestimonial
“I can confirm that we are very happy with the installation – your team has done a good job. The children are so excited to have the play towers back in circulation after 2+ years of not being able to use them. They form an orderly queue each day to take their turn in using the area! It looks good – the colours blend really well. Thank you.”
Kathryn Tunstall – School Business Manager