Flooring Refurbishment – The Boswells School
The Brief
Location:
The Boswells School
Date:
September 20th 2023
Job Type:
Refurbishment of Sports Hall Flooring
Get In Touch TodayThe Boswells School were looking to refurbish their Sports Hall flooring as their current lines were fading, and the floor was looking old and worn down. Refurbishing the flooring saves replacing the whole floor, and makes it much more appealing to the users.
Installation
The Boswells school approached Sportsafe to refurbish their existing Sports Hall flooring. Our installation team carried out the sanding and sealing process to start, this helps to freshen up and clean the floor, while protecting it for future uses. The next stage was to mark out four Badminton courts, one Basketball court, one Netball court, one Volleyball court, one Five A-Side court and four practise keys. The lines are durable and long lasting and will enable users to get the full use out of their Sport Hall.
View Sports Hall FlooringOutcome
The team thoroughly enjoyed refurbing The Boswells School Sports Hall flooring, and the site was thrilled with the new, fresh look and can’t wait to use the new games lines.