In early 2015 we were contacted by Kings Rise Academy in Birmingham enquiring about a series of playground installations including replacing an existing trim trail unit with a play fort and the installation of a new outdoor classroom area.

The installation was requested to take place out of term time to avoid any disturbance to the students. After a short consultation process we were delighted when we won the job. The job was completed over a week and was delivered within the project budget. The transformation is wonderful, the new play areas and outdoor classrooms speak for themselves.

Before

OLYMPUS DIGITAL CAMERA

 After

KR 7

 Before

OLYMPUS DIGITAL CAMERA

 After

Gazebo 4

  The outdoor classroom has space for 20 students and provides shelter during playtimes and lunch times. The gazebo and play fort are made out of weather resistant tanalised timber to prevent rot and should last at least ten years.

The play fort is mounted on a premium artificial grass surface with shock pads underneath to provide the recommended fall height protection for students during use. Both these installations are built in accordance with EN1176 and EN1177 protocols ensuring safety.

Kings rise academy is delighted with the final results and the students seem to love their new play area!

If you would like some more information about Sportsafe UK’s outdoor installation please don’t hesitate to contact us on 0844 581 0550 or email [email protected]