Chat with us, powered by LiveChat

Phone Sportsafe Help or Advice? Call Today 0333 300 0032

CASE STUDY

Basketball Units Installation, Nottingham

BRIEF

Trinity Catholic School Academy has a thriving basketball scene and its units had seen a lot of wear and tear. Sportsafe was asked to renew the basketball units to bring them up to standard.

INSTALLATION

Our engineers quickly assessed the basketball units and realized they needed to immediately be taken down. One of the walls had come under severe stress and our engineers worked hard to ensure it was safe for future users. They installed an extra piece of structure to spread the load of the new basketball unit and minimize the load for the wall.

OUTCOME

This was a challenging job and one we really enjoyed rising to. The students at Trinity Catholic School are now back to playing basketball and staff are reassured they have the best installation at the right price.

SHARE YOUR BASKET